Skip to main content
TNG — Truong Technology

Manufacturing capability

Mechanical & hydraulic manufacturing capability

TNG's factory in the HCMC Auto Mechanics IZ runs CNC/NC lathes, welding robots and an in-house quality-control process end to end — building hydraulic cylinders, pumps, valves and power units to engineering standard.

Equipment

Machinery & production line

We invest in a matched set of CNC/NC machine tools, welding robots and metrology equipment to control tolerances and surface finish to ISO standards — so every part matches its drawing.

  • CNC/NC lathes

    Precision turning of shafts, cylinder bodies and rotational parts with tight tolerance control per drawing.

  • Automated welding robots

    Robotic welding for consistent, stable welds and high throughput on steel structures and cylinder bodies.

  • CNC milling machining centre

    Milling, drilling and reaming of flanges and complex parts in a single set-up.

  • Metrology & inspection equipment

    Measuring dimensions, roughness and concentricity to sign off each stage.

Process

Production process

LOT and one-by-one production: every stage is tightly controlled, from raw material to packaging and dispatch.

  • Raw materialsRaw materials
  • CuttingCutting
  • MachiningMachining
  • WeldingWelding
  • AssemblyAssembly
  • Performance testingPerformance testing
  • Packaging & dispatchPackaging & dispatch
  1. 1Raw materials
  2. 2Cutting
  3. 3Machining
  4. 4Welding
  5. 5Grinding
  6. 6Cleaning
  7. 7Assembly
  8. 8Inspection
  9. 9Performance testing
  10. 10Packaging & dispatch

Factory imagery

A selection of representative production areas at the TNG factory. Select an image to enlarge it.

Quality control

Quality-control (QC) process

Every product passes a multi-stage QC process — from incoming material to final sign-off — to guarantee it meets specification and operating durability.

  1. Incoming material inspection

    Checking material certificates and blanks before they enter machining.

  2. In-process control

    Monitoring tolerances and roughness on the line at every operation.

  3. Dimensional & tolerance inspection

    Measuring key dimensions with metrology equipment, recorded and filed.

  4. Final inspection & sign-off

    Overall check, seal/pressure testing and sign-off before delivery.

Certifications

ISO system certifications

TNG's management systems are certified to international standards. Download each certificate below.